Well Testing and Wireline Operations
________________________
Transfer Pump
This equipment is used to transfer the oil in the tanks to burning pit in order to avoid oil spillage and contamination of the environment.
Wireline Winches
OEOC owns two skid mounted wireline winches for working on offshore and light jobs and three truck mounted wireline winches for heavy duty jobs on both onshore and offshore.
Truck mounted winches are very advanced and equipped with computerized system called "Smart Display".
This system has capability of showing information such as depth, speed and tension to the operator at any time during the operation. It is also possible to adjust maximum permitted settings, so that when they exceed the threshold, it starts to make a sound alarm. This way, the risks involved in the operation are minimized.
To control surface pressure we have three sets of 10 k lubricator with Bop and Amos co valves.
Bottom Hole Sampler
To take bottom hole sample we use two types of sampler, Ruska and LEUTERT .
with these samplers 400 and 600 cc samples can be taken .
LEUTERT sampler is new and operates as positive displacement mechanism resulting in considerable decrease of sampling time.
Choke Manifold
There are two 15 k and three 10k chock manifolds to flow the well through desired choke sizes. This is necessary for maintaining proper pressure drop on surface in order to divert the flow to the separator.
Flow Head
OEOC has four Flow Heads with 15000 psi working pressure. By using Flow Head for temporary completion; there would be no need to remove Rig Bop's. Consequently the rig time is saved and the setting of the packer is completed much easier.