Well Testing and Wireline Operations
___________________
Coil Tubing
This is an instrument for rapid connection of well surface to the reservoir.
1. Nitrogen injection
2. Acid injection
3. Cement injection
4. Cement plug installation
5. Washing inside of tubing
6. Fishing
7. Cement plug drilling
8. Drilling
9. Logging
PVT Analysis
To perform PVT analysis on oil, we use very advanced Hg free equipment called PRISM. This equipment uses only 2 cc of oil for analysis.
Mobile Workshop
Servicing or redressing at the well sites is carried out by a well equipped workshop which could be rapidly transferred to any well site at any time.


No comments:
Post a Comment